PROJECT DETAILS

Earthwork in filling : 16,10,000 cum

Filter material : 25,000 cum

Boulder pitching & apron : 76,000 cum

Drainage works : 3,000 RM

Sausage Crates : 1,47,000 cum

Pointing : 85,000 cum

Turfing : 67,000 cum

WBM on top of guide bund : 3,355 cum

Client : North Eastern Railway, Gorakhpur (U.P.)

Continental Construction Limited was awarded the contracts for the works in connection with restoration of rail link between Chhitauni in Uttar Pradesh and Bagah in Bihar comprising a rail-cum road bridge 986m (14 spans of 64 meters each) long on well foundations, river training works including spurs & guide bunds of flume the river from 9 km to 1 km regime width, approach banks of a 8.53 km length incorporating extensive aprons and riprap pitching, turfing on bio-degradable geo-jute grids on the upper reaches of slopes, brick lined drains and top filters.