Portfolio
PROJECT DETAILS
Intake & Raw water : 66.5M x 14.5M x 17M
Pump House :
Raw Water Pumping Line : 3×2 Km long, 1800 mm dia ductile iron pipes
Presettlement Tanks : 3 Nos., 110M x 67M x 21.6M
Clarifiers : Three streams of 6 circular tanks, each 53M dia and 11M deep
Filters : 3 Nos., 150M x 125M x 5.3M
Treated Water Reservoirs : 210M x 98M x 5.4M & 100M x 100M x 5.4
Treated Water Pumping Station : 67M x 15M x 17M
Chemical Building : 241M x 79M with height from 8.5M to 25M
Transmission Pipeline : 2 x 40 Km of 2300 mm & 2100 mm dia ductile iron pipes
Cross River Link : 28 Km of 1600 mm & 1400 mm dia ductile iron pipes
Concrete : 500,000 cum
Earthwork : 8,000,000 cum
Reinforcement Steel : 82,000 MT
Foundation Piles : 50,000 Nos.
Purpose : Supply of potable water to the city of Baghdad
Client : Baghdad Water Supply Administration, Baghdad, Iraq
C1365 MLD turnkey project including investigation, process design and construction of civil works, erection and supervision of electro-mechanical plant for the headworks, transmission & distribution system, trail run and commissioning. Major components of the work consisted of river intake, pumping stations, raw water pumping line, treatment works including presettlement tanks, clarifiers, filter blocks, chlorine contact tank, treated water reservoirs, chemical building, ductile iron transmission pipeline, trunk and distribution networks, service reservoirs, area development, landscaping and infrastructure works.

ENGINEERING CONSTRUCTION
Precasting yard fully equipped with boiler for steam generation & EOT cranes was set up for precasting of 10,000 major elements and 25,560 minor elements. The major elements weighed up to 20 MT. Precast beam for Saqlawia Bridge weighed 80 MT. distribution networks, service reservoirs, area development, landscaping and infrastructure works.
ENGINEERING CONSTRUCTION
For power supply to the project, diesel generators were provided. The installed load of electricity exceeded 8000 KW.
Pipe factory for manufacture of concrete pipes by vertical cast high vibration method for pipes of dia. 1050
