PROJECT DETAILS

Tunnel : 6 M dia, 4,500 M long

Open Excavation : 635,000 cum

Concrete : 322,000 cum

Reinforcement Steel : 7,320 MT

Concrete Tunnel Lining : 54,000 cum

Cement Grouting : 8,750 MT

Concrete Diversion Dam : 5 bays of 13 M each having 4 M thick piers

Intake : 8 bays of 8 M each

Sedimentation Tanks : 98 Hoppers, 13Mx13M

Purpose : Hydro Power Generation (304 MW)

Client : Govt. of Uttar Pradesh, India

39 metre high concrete Diversion Dam/Barrage across River Bhagirathi, intake structure, desilting basin and hoppers, 6 metre finished diameter headrace tunnel, rock excavation, foundation treatment, grouting, coffer dam, river diversion and appurtenant works at Uttarkashi, Uttar Pradesh, India

PROJECT DETAILS

Common Excavation : 130,622 cum

Under Ground Excavation: 68,000 cum

Concrete: 202,747 cum

Reinforcement Steel: 1,942 mt

Structural Steel: 200 mt

Stone Masonry: 8,333 sqm

Dewatering : 4,000,000 Kwh

Client: Irrigation Department, SE, Joshiyara, Uttarkashi, Utaranchal

 

ENGINEERING CONSTRUCTION

Construction of barrage, intake structure, sedimentation chamber, forbay, flushing conduit etc., head race
tunnel (upto 4.5 km -dia 6 m) of Maneri Bhali hydro-electric project stage-II from Joshiyara end including
masonary works and fixing of granite stone in Barrage.