Raw water Intake: Left Bank of Tigris – Design & Built for the Final Stage (500 MGD)
Raw Water Pumping Station: 200 MGD with 6 Pumps (4 Working, 2 Standby) – Civil Works for Final Stage
Raw Water Pumping Line: 5 Km long, 2000 mm Dia ductile iron pipes
Water Treatment Plant: 2 Streams of 100 MGD, each including the following works
- Two ozone contact chambers for the pre-oxidation by ozone
- Two mechanical mixers for addition of alum and polyelectrolyte
- Eight circular clarifiers with associated distribution chamber and desludging equipment
- Fourteen rapid gravity sand filters with filter backwashing and control facilities
- One treated water reservoir of 90,000 m3
- A chemical handling, storage, preparation and dosage facilities for lime, alum and polyelectrolyte
- A chlorine building
- An ozone generating plant
- One treated water pumping station (TWPS): Civil works and equipment for the final stage of 500 MGD with a total of 16 pumps, 12 working and 4 as stand-by
- The filter wash water recirculation
- The sludge disposal facilities
- All auxiliary equipment including the service water distribution (potable water
- The MT and LT electric distribution within the works
- The stand-by generating plant
- The control and supervisory equipment
- Indoor and outdoor lighting
- Fire detection and fire protection equipment
- Drainage and overflow system
- An administration building with offices, laboratory and central control room
- A workshop with necessary tools
- Housing for operators with mosque and stores
Purpose: Supply of potable water to the city of Baghdad
Client: Baghdad Water Supply Administration, Baghdad, Iraq
The aim of the Al Rusafa Water Supply Project is to provide drinking water to Baghdad area with a maximum capacity of 500 MGD (2,275,000 m3/day) to address the deficit in demand. This final stage will be achieved by five streams of 100 MGD. This is the First Stage where 200 MGD has been considered. The following stages of 300 MGD in design of general layout and in arrangement of raw water intake and pumping station has also been taken into account.