PROJECT DETAILS

Diversion Structure : Trench Weir, 6.0 m long

Desilting tank cum Forebay : D tank: 7.00 m (L) x 4.40 m (W) x 1.30 m (D) ,Forebay:13.19 m (L) x 4.40 m (W) x 3.10 m (D)
Penstock : 0.50 m diameter, 875 m long

Power House : 22.5 m x 15.65 m, Surface

Turbine : 2 nos. Pelton turbine

Generator : 2 x 500 KW, Synchronous

Purpose : Hydro power generation

Scope : EPC Contract for construction of Barthi SHEP (1MW) in turnkey basis.

Client :  CJJHPPLConstruction of Kodasalli dam & appurtenant works over Kalinadi Hydroelectric Project Stage II, in Karnataka.

The project is located on Barthi Nallah which is a tributary of Parvati River . Barthi Nallah originates at an elevation of around ±5000 m and has a catchment area of 4.6 sq.m. above diversion site. It is a run of the river scheme and utilizes a net head of 371 m for generation of 1 MW hydro power.