PROJECT DETAILS
Diversion Structure : Trench Weir, 10m long
Desilting tank : 16.0 m (L) x 4.0 m (W) x 2.67 m (D)
Forebay : 23.00 m (L) x 4.50 m (W) x 3.56 m (D)
Penstock : 0.75 m diameter, 956 m long
Power House : 22.5 m x 15.65 m, Surface
Turbine : 2 nos. Pelton turbine
Generator : 2 x 1500 KW, Synchronous
Purpose : Hydro power generation
Scope : EPC Contract for construction of Chaksi II SHEP (3MW) in turnkey basis.
Client : CHPL
Chaksi–II SHEP is located on Chaksi Nallah which is a tributary of Parvati River which in turn is a tributary of Beas River. The project is a run of the river scheme and utilizes a net head of 333.96 m for generation of 3 MW.