Portfolio
PROJECT DETAILS
Tunnel : 9.5 M dia, 3700 M. long
Rock Excavation : 404,000 cum
Steel Support : 1,000 MT
Concrete Tunnel Lining : 50,000 cum
Rock Bolting : 121,000 M
Purpose : Hydro Power Generation (540 MW)
Client : Konkan Railway Corporation Ltd.,
BelapurLaying of Ballastless track Total Length = 5264 m
Tunnel 4&5 – 830m (straight – 660.68m & curved – 169.31m)
Tunnel 8 – 2445 m straight
Tunnel 9 & 9A – 899 m (straight – 260.44m & curved – 270.33m)
Tunnel 10 A – 1090 M (straight – 260.44m & curved – 829.56m)


PROJECT DETAILS
Excavation : 7,200 m3
U/G excavation : 74,335 m3
Tunnel support : 1,650 mt
Precast RCC lagging : 2,359 m3
Drilling: 6,500 m
Contact grouting : 2,000 m
Pressure grouting : 200 mt
Shotcreting : 2,600 m3
Client: Jammu Tawi Northen Railway, India
ENGINEERING CONSTRUCTION
The work involves 2400 m of 6m x 8m ‘D’ shaped tunnelling, 20 m span prestressed concrete bridge shotcreting etc.