PROJECT DETAILS
Open Excavation : 31600 cum
Under Ground Excavation : 151590 cum
Concrete : 10600 cum
Shotcreting/Lining : 58671 cum
Reinforcement Steel : 2530 mt
Structural Steel : 1179 mt
Rock Bolt(25 & 32 mm dia) : 359250 mts
Consolidation Grouting : 4125 mt
Wiremesh : 172700 sqm
Dewatering : 900000 Kwh
Client : Himachal Pradesh State Electricity Board
Construction of 2075 m long, 10.5m dia modified horse shoe Highway (NH-21) Tunnel as extension of Highway Tunnel from RD 646.30 including 125m long, 7.25m X 6.5m, D -shaped construction Adit of Larji HE Project.