top bar
Bhatan Twin Tube Tunnel Project
Bhatan Twin Tube Tunnel Project, India

Bhatan twing tube tunnel for konkan railway are 3nos – 17.6x 9.47m D shaped and 500 M long each. We have achieved tunnel excavation of more than 7000 cum per month continuously for 5 months.

Underground excavation 1,47,760 m3
Permanent steel support 247 mt
Concrete lining 2,798 m3
Rock bolting 48 mt
Steel fibre reinforced 3,174 m3
Client Konkan Railway corporation ltd. Belapur

bottom bar